Jeep Cherokee (XJ): Disassembly and assembly
Jeep Cherokee (XJ) 1984 - 2001 Service Manual > Transmission and transfer case > Automatic transmission-30RH > Disassembly and assembly
- Governor and park gear. Valve body. Transmission
- Overrunning clutch/low-reverse drum. Front servo piston. Rear servo piston
- Oil pump and reaction shaft support
- Front clutch. Rear clutch. Planetary geartrain/output shaft
Output shaft rear bearing. Governor and park gear. Park lock
Output shaft rear bearing
REMOVAL
(1) Remove extension housing.
(2) Remove snap ring that retains rear bearing on
output shaft (Fig. 84).
(3) Remove bearing from output shaft.
INSTALLATION
( ...
Governor and park gear. Valve body. Transmission
Governor and park gear
DISASSEMBLY
(1) Remove governor body from transmission.
(2) Clean and inspect governor filter (Fig. 89).
(3) Remove snap ring and washer that secure governor
weight asse ...
Other materials:
Emissions inspection and maintenance programs
In some localities, it may be a legal requirement to pass
an inspection of your vehicle's emissions control system.
Failure to pass could prevent vehicle registration.
For states that require an
Inspection and Maintenance
(I/M), this check verifies the "Malfunction
Indicator Light (MIL)" is ...