Jeep Cherokee (XJ): Removal and installation
- Engine mounts-front. Engine mount-rear. Engine assembly
- Intake and exhaust manifold
- Exhaust manifold-4.0L engine. Cylinder head cover. Rocker arms and push rods
- Valve springs and oil seals. Cylinder head. Valves and valve springs
- Hydraulic tappets. Vibration damper. Timing case cover
- Timing chain and sprockets. Camshaft. Camshaft bearings
- Crankshaft main bearings
- Oil pan
- Pistons and connecting rods
- Crankshaft oil seals-rear. Oil pump. Timing case cover oil seal
Service engine assembly (short
block). Hydrostatic lock. Engine oil service
Service engine assembly (short
block)
A service replacement engine assembly (short
block) may be installed whenever the original cylinder
block is defective or damaged beyond repair. It
consists o ...
Engine mounts-front. Engine mount-rear. Engine assembly
Engine mounts-front
The front mounts support the engine at each side.
These supports are made of resilient rubber.
REMOVAL
(1) Disconnect negative cable from battery.
(2) Raise the vehicle.
...
Other materials:
Oil Change Reset. DID Selectable Menu Items
Oil Change Reset
Oil Change Due
Your vehicle is equipped with an engine oil change
indicator system. The "Oil Change Due" message will
display in the DID for five seconds after a single chime
has sounded to indicate the next scheduled oil change
interval. The engine oil change indicator system i ...
